Footbridge on railway station in Pozega, Grand opening

Grand opening of Footbridge on railway station in Pozega, was held on monday 17.01.2011. In May 2009. Mostprojekt completed main design of footbridge in Pozega. Structure is steel truss with spans 27.75+20.23+27.75m. Responsible designer - Novak Velovic grad. civil. eng.

Pas001

Pas003

Pas003

Pas003

Pas003

Pas003

Pas003

Pas003